Tuesday, July 11, 2006

preparing for pipes


This weekend Dom finished cutting all the channels in the ceiling downstairs where the pipes to the radiators will run. Although this saves us lifting all the floorboards upstairs, it means we have had to drill holes through each beam that are wide enough for the pipes to go through. This was quite a messy job and took all weekend.

In between drilling, Dom managed to hang one of the chrome towel radiators in the bathroom and we ordered all the other radiators at a great price from our local plumbing store Gurney & White - they arrive today!

Labels:

0 Comments:

Post a Comment

<< Home

 


swatt
london fox
beau selecta

Powered by FeedBurner

Add to Technorati Favorites!

British Blogs