the challenge
Dom has spent all weekend getting the loft flooring down so it can be properly used for storage. I spent a few hours today stripping wallpaper in what is to be our office.
This is what we have to do in 5 months:
all rooms need lighting to be wired; the downstairs ceiling needs to be put back up; we need a new loft hatch; the walls in the airing cupboard need finishing and shelves put up for storage; the stair rail needs taking down; the wall between the downstairs toilet and the coat cupboard needs to be put back up; we need to fit a new front door; all walls need sanding and filling or plastering then ceilings and walls need painting; the skirting boards downstairs need putting back; all the upstairs rooms, landing and staircase need carpeting; all the downstairs rooms need new flooring; we need a new bathroom suite and a new kitchen, including new appliances, this will involve re-plumbing the washing machine through into the conservatory; kitchen and bathrooms need tiling; the office needs fitting out; our bedroom needs wardrobes fitting; the TV/ multimedia housing needs building; all the doors need sanding and painting; all the door handles need to be changed; all the switches and sockets need replacing; and finally, we need a new dining table and chairs, new sofa, new curtains and blinds.
Wish us luck!
Labels: d.i.y.









0 Comments:
Post a Comment
<< Home